Skip to main content
All United Kingdom tenders

Temporary Works Designer - Framework

Ferrovial BAM Rail Systems

To construct the main works, the (Ferrovial BAM JV) Track Systems Contractor (FBRS) will develop and operate various compounds (including railheads) along the route, to meet the construction logistics requirements of FBRS and also support the requirements of other Railway System Contractors from the Alliance. These compounds will require temporary works that will not form part of the final permanent works. The number and location of the compounds to be used are still to be confirmed at this stage: The Consultant shall achieve integration and coordination between temporary and permanent works design, liaising with the Permanent Works Designer where required. Examples of the scope of this required design works are as follows (but not limited to) within compounds and railheads- •Temporary site buildings and offices •Temporary utilities & services •Temporary roadways and hardstandings •Temporary site drainage systems •Fencing •Lighting & Security systems Note: the scope does not include any design of Track layouts and geometry, Track, Track drainage, LWR and S&C hardstanding areas, associated gantry foundations within the railheads. Potential mobilization start (soft start) in October 2026 - then estimated full start February 2027.

AI proposal generator

Generate a structured solution proposal in 90 seconds

Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal Save in the Asistan iOS app

Related opportunities

Found via vector similarity