ELECTRICAL SWITCHING STATION NORTH, WATERVLIET ARSENAL, NEW YORK
W2SD ENDIST NEW YORK
The New York District (NAN) of the U.S. Army Corps of Engineers (USACE) proposes to perform Installation of a switching station capable of feeding 4000 kW of power into the existing south switch station. Description Electrical Switching Station North, Watervliet Arsenal, New York Scope: This project will consist of constructing an electrical switching station to provide backup power in the event of a long-term power outage from the facility Main Substation. The scope entails the procurement and installation of four (4) 2MW generators, construction of a facility for the generators, installation of electric manholes, duct bank, grounding cable, fencing, switchgear, transfer switches, cables, splices and connections, paving, walks, curbs, gutters, and utilities testing and commissioning. Additionally, all necessary utility interconnections to bring fuel to the power generation facility and connecting the new switching station to the existing. Acquisition Strategy: The project will be unrestricted and require a subcontracting plan. The construction contract for this project will be procured through the Best Value Trade Off strategy via Request for Proposal (RFP) and a firm fixed price (FFP) construction contract shall be awarded. The Government will evaluate the proposals in accordance with the Source Selection Criteria, and award a firm fixed price contract to the responsible firm, whose proposal conforms to all the terms and conditions of the solicitation and is fair and reasonable and offers the best overall value to the Government. It is anticipated that the RFP will be posted electronically via the SAM.gov on or about 15 MARCH 2026 and the proposals will be due approximately 45 days later. Any and all amendments shall be likewise posted. Hard copies will not be available. It is the contractor's responsibility to monitor the SAM.gov web-site for any amendments. The period of performance for this project is approximately 1081 calendar days from the Notice to Proceed
AI proposal generator
Generate a structured solution proposal in 90 seconds
Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Found via vector similarity
Station Coos Bay Diesel Generator Replacement
BASE SEATTLE(00033)
The provision of Reserve Feed Water Tank (RFWT) Balance Main Flow Meter Installation Project at Arnot Power Station for a period of 3 years
ESKOM
The provision of Reserve Feed Water Tank (RFWT) Balance Main Flow Meter Installation Project at Arnot Power Station for a period of 3 years
ESKOM
29--ALTERNATOR,14V
DLA LAND AND MARITIME
Z1DA--642-22-104 | Upgrade Substation Building 2 Phase 1 | Kevin Rodgers | NCO 4 Construction East (VA-26-00030476)
244-NETWORK CONTRACT OFFICE 4 (36C244)