Skip to main content
All United States tenders

INDUSTRY DAY_NOAA/USCG Recapitalization Project (Design-Build)

DEPT OF COMMERCE NOAA

Purpose: The National Oceanic and Atmospheric Administration (NOAA), in support of the United States Coast Guard (USCG), invites interested industry partners to attend an Industry Day for the USCGC STORIS Homeport Recapitalization Project in Juneau, Alaska. This event is intended to: Provide a high-level overview of the project scope and objectives Highlight key technical challenges and execution considerations Offer industry insight into site conditions and operational constraints Support market awareness in advance of the formal solicitation Provide a site walk for potential design/build contractors Project Overview: The Government is planning a Design-Build (DB) project to recapitalize and modernize the waterfront infrastructure at USCG Station Juneau to support the homeporting of USCGC STORIS and visiting cutter classes. The project will deliver a resilient, mission-ready waterfront facility capable of supporting Coast Guard operations in the Arctic and Alaska region, including search and rescue, maritime security, environmental response, and national defense missions. The anticipated construction magnitude is approximately $125M–$200M, with contract award currently projected for FY26 (Q4). Scope Overview (High-Level): The project generally includes the Design-Build recapitalization of the existing waterfront and supporting infrastructure, including: Demolition of aging waterfront wharf and support facilities (not existing shoreside buildings) Construction of a new wharf to support at least (1) cutter berth Construction of a new floating pier system supporting multiple (2) cutter berths Fender systems and mooring infrastructure for USCG and visiting vessels Shore power and electrical system upgrades Potable water, sewer, fire protection, and communications systems Backup power and site-wide utility distribution Civil/site improvements Optional work may include the following: MWD building renovations Covered floating small boat facility Additional building renova

AI proposal generator

Generate a structured solution proposal in 90 seconds

Claude drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal Save in the Asistan iOS app

Related opportunities

Found via vector similarity