Design and Construction of a New Water Transmission pipeline 800/700 between Al Zumleh Reservoir and Za’atari Pumping Station
Yarmouk Water Company
Notice of Request for Proposals Request for Proposals Works (Design and Build) Procurement of: Design and Build of new water transmission pipeline Connecting Al Zumleh and Za’atari Employer: Yarmouk Water Company/ YWC Project: Jordan Water Sector Efficiency Program Contract title: Design and Construction of a new water transmission pipeline between Al Zumleh Reservoir and Za’atari Pumping Station (DN 800 mm and DN 700 mm) Country: Hashemite Kingdom of Jordan Loan No.: Loan No. 9560-JO, CFF TF No. TF0C1892, AFD No. CJO 1141 01P RFP No: JO-YWC-0109-CW-RFP Issued on: June 30, 2026 1. The Ministry of Water and Irrigation has received financing from the International Bank for Reconstruction and Development (World Bank), the Agence Française de Développement (AFD) and Global Concessional Financing Facility (GCFF) in the amount of US$300,000,000 to be managed by the World Bank, toward the cost of the Jordan Water Sector Efficiency Project, and it intends to apply part of the proceeds toward payments under the contract for Design and Build of new water transmission pipeline Connecting Al Zumleh and Za’atari (DN 800 mm and DN 700 mm) . “For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.” 2. Yarmouk Water Company / YWC now invites sealed Proposals from eligible Bidders for Design and Build of new water transmission pipeline Connecting Al Zumleh and Za’atari (DN 800 mm and DN 700 mm). 3. Local Jordanian Bidders: shall be classified by the GTD as Grade (1) in the field of water and wastewater 4. International Bidders: If awarded the contract, the bidder must register or be registered and classified by the Ministry of Public Works and Housing in the field of water and wastewater and (single or in Joint Venture) and according to the HKJ regulation. 5. The procurement will be conducted through international competitive procurement using Req
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Construction supervision of the design and build of a transmission pipeline from Al Zumleh Reservoir to Al Za’atari Pumping Station, alongside detailed design, environmental and social studies, and tender document preparation for Taibah District in Irbid
Yarmouk Water Company
Design and build water Networks in Northern Al-Salt Areas / Balqa Governorate.
Miyahuna Water Company
Design, Supply and Installation of Telecommunication systems
National Electric Grid of Uzbekistan..
Supply and Delivery of Pipes and Fittings for the Eswatini Water Supply and Sanitation Access Project
Eswatini water Services Corporation
Construction of a water supply pipeline and water meter boxes to connect 48,917 households in the Balkh, Dusti, Vakhsh, and Vose districts (Lots 1 and 2)
MIDP Project Management Unit