Skip to main content
All United States tenders

Construction of Gelephu - Tareythang roads on Southern East-West Highway; Package-III from Ch. 8453.0m till 14,141.0m

Department of Surface Transport, Ministry of Infrastructure and Transport

Specific Procurement Notice Invitation for Prequalification Country: Kingdom of Bhutan Name of Project: Accelerating Transport and Trade Connectivity in Eastern South Asia (Access) – Bhutan Project Contract Title: Construction of Gelephu-Tareythang Road and Bridges Loan No./Credit No./Grant No: IDA 77560 (Credit)/IDAE4310 (grant) Prequalification Reference No : ACCESS/DOST/WD-1, ACCESS/DOST/WD-2 and ACCESS/DOST/WD-3 1. The Royal Government of Bhutan has received financing from the World Bank toward the cost of the proposed Accelerating Transport and Trade Connectivity in Eastern South Asia (ACCESS) – Bhutan Project , and intends to apply part of the proceeds toward payments under the contracts for ACCESS/DOST/WD-1, ACCESS/DOST/WD-2, and ACCESS/DOST/WD-3 for the Construction of Gelephu-Tareythang Road and Bridges. 2. The Department of Surface Transport (DoST), Ministry of Infrastructure and Transport (MoIT), Royal Government of Bhutan, intends to prequalify contractors for the following work packages under the Gelephu-Tareythang Road Project involving the construction of 12,600 m of roadway and major bridge structures. The project comprises five major bridges with bridge lengths varying from 320 m to 1020 m, including PSC I-Girder and Cast-in-Situ Balanced Cantilever superstructures. The longest structure is the Mau River Bridge with a total length of 1020 m. The project corridor starts from Gelephu Town and terminates at Tareythang. The contract packages are described below: i. Package I: Segment 1 to 5 (km 0.000 to km 3.868) Construction of a 4-lane carriageway including earthworks, pavement, drainage, slope protection works, and associated ancillary works. The package also includes construction of the following two major bridges: Gelephu Bridge – PSC I-Girder Bridge of span configuration (2 × 40 m); and Mau River Bridge – Cast-in-Situ Balanced Cantilever Bridge of span configuration (4 × 60 m) + 2(60 + 2 × 90 + 60) + (3 × 60 m), including associated structures and

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of United States tenders

New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.