Skip to main content
All United States tenders
United Statesservicesopen

ANGKOR SENTINEL 27 TRANSPORTATION SERVICES

0413 AQ HQ CONTRACT AUG

Questions and Answers The RFQ says not to share it with other vendors, while the PWS contemplates subcontractors. May Prime Contractor provide necessary scope details to prospective performing subcontractors solely to obtain pricing? Please identify any approval or nondisclosure requirements. You are allowed to share the PWS and Combined Synopsis and Solicitation with prospective subcontractors. Please provide the referenced Excel Pricing Sheet and Section 889 form, or identify their download location. No excel pricing sheet provided, please provide an excel document format for the pricing referenced in the CLIN structure on Combined Synopsis and Solicitation. You can complete the Section 889 section on the Combined Synopsis and Solicitation. Should the two cultural-event options be separately priced and included in the evaluated total? The pricing table includes options, but the evaluation text states there are no options. Cultural Event CLINs shall also be evaluated. Please reconcile CLIN 0004 for DBA insurance with the instruction that DBA costs will not be separately priced or evaluated. DBA shall not be evaluated, since it would only be an estimate until awardee is selected. But interested vendors are requirement to have an estimate quote for DBA Insurance. Please confirm minimum seating of nine passengers per van and 45 per coach, excluding drivers, given inconsistent wording in PWS 5.2(a)-(b). Minimum seating excluding drivers are 45 Passengers/Seats; Disregard error on PWS 5.2(a) Title 40 Passenger Bus. Requirement is for 45 Passengers Minimum excluding drivers. The PWS describes the daily commute (13–27 February) as “Daily transit from Phum Serey Hotel to the PKO Training Center (morning departure and evening return).” Trips per day: Should vendors assume one round trip per day, with a morning trip from the Phum Serey Hotel to the PKO Training Center and an evening trip back to the hotel? Or should they plan for additional trips during the day? The daily co

AI proposal generator

Generate a structured solution proposal in 90 seconds

Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.

✓ Word + PDF + Markdown·✓ Editable·✓ Free regen if quality is poor
Generate proposalfrom €49 · or via subscription
View on source portal

Related opportunities

Similar tenders

Free tender alerts

Get a weekly digest of United States tenders

New United States tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.