Public tenders
Tenders
Filtered to "Rwanda". Adjust filters above to broaden or narrow the result set.
145 matching · page 1 of 7
Carrying-out Environmental and Social Audit services for Lusahunga - Rusumo Road rehabilitation, and CERC interventions
Tanzania National Roads Agency
THE UNITED REPUBLIC OF TANZANIA MINISTRY OF WORKS TANZANIA NATIONAL ROADS TANZANIA TRANSPORT INTEGRATION PROJECT (TanTIP) PROJECT ID: P165660 CONSULTANCY SERVICES FOR CONSULTING FIRM FOR UNDERTAKING ENVIRONMENTAL AND SOCIAL AUDITING FOR LUSAHUNGA - RUSUMO ROAD AND CERC PROJECTS UNDER TANZANIA TRANSPORT INTEGRATION PROJECT (TANTIP) Tender No; TR36/2026/2027/C/22 REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS SELECTION) The Government of the United Republic of Tanzania has received the financing from the World Bank towards the cost of the Tanzania Transport Integration Project (TanTIP), and intends to apply part of the proceeds for eligible payments under the contract for Consultancy Services for undertaking Environmental and Social Auditing for Lusahunga - Rusumo Road and CERC Projects under Tanzania Transport Integration Project Project Location and Description The Lusahunga – Rusumo road section (92 Km), forms part of the T3 (Central Corridor Highway) which connects the Dar es Salaam port with the land locked neighboring countries of Rwanda and Burundi. The project road starts at Lusahunga centre through Nyakasanza and ends at Rusumo Border (Tanzania and Rwanda). The Lusahunga – Rusumo road was upgraded in 1985 to bitumen standard for a design life of 15 years. The road consists of 27 box culverts 52 steel pipe culverts and 8 reinforced concrete culverts. Out of 92 Km of the project road 63 Km are located in Biharamulo district and the remaining 29 Km are located in Ngara District. The Project Road traverses through four villages in Biharamulo district namely Lusahunga, Kikoma (Lusahunga Ward), Ngararambe and Nyabugombe, (Nyakahura ward) while on the Ngara district side there are two villages of Kasulo (Kasulo ward) and Rusumo (Rusumo ward). Currently, the road is under construction after had deteriorated drastically due to pavement aging despite the efforts that had been carried out by TANROADS - Kagera Regional Manager, to maintain and repair. T
Purchase of Fifteen (15) EV Vehicles
Rwanda Energy Group - Energy Development Corporation Limited
Specific Procurement Notice Procuring Agency: Energy Development Corporation Limited (EDCL)-Rwanda Name of Project: Rwanda Energy Access and Quality Improvement Project (EAQIP) Title: Purchase of Fifteen (15) Electrical Vehicles RFB No .: RW-REG/EDCL-569697-GO-RFB Loan No./Credit No./Grant No.: IDA-67760 The Government of Rwanda has received financing from the World Bank toward the cost of the Energy Access and Quality Improvement Project and intends to apply part of the proceeds toward payments under the contract for Purchase of Fifteen (15) Electrical Vehicles “For this contract, the Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing.” 2. The Energy Development Corporation Limited (EDCL) now invites sealed Bids from eligible Bidders for Purchase of Fifteen (15) Electrical Vehicles. These EVs will be delivered within 45days to EDCL HQ Office from contract signature. 3. Bidding will be conducted through National competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s “Procurement Regulations for IPF Borrowers” Seventh Edition, September 2025 (“Procurement Regulations”) and is open to all eligible Bidders as defined in the Procurement Regulations. 4. Interested eligible Bidders may obtain further information from EDCL, procurement@edcl.reg.rw copy to jdruberanziza@edcl.reg.rw and inspect the bidding document during office hours from 09:00 AM to 17:00 PM at the address given below . 5. The bidding document in English may be purchased by interested eligible Bidders upon payment of a nonrefundable fee of 50 USD (receipt to be sent by email). The method of payment will be deposit on the Bank Account N° 1000057734 in USD opened at National Bank of Rwanda in the name of EDCL EAQIP IDA Designated Account, Swift Code: BNRWRWRW. The document will be sent by e-mail or downloaded on the REG website: www.reg.rw. 6. Bids must be de
Consultancy services for conducting an independent Environmental and Social completion audit for EAQIP project
Rwanda Energy Group - Energy Development Corporation Limited
Kigali, on 25/08/ 2026 Reference No .: RW-REG/EDCL-560520-CS-CQS Invitation for Expressions of Interest (Consulting Services – Firms Selection) Project: Energy Access and Quality Improvement Project Loan No./Credit No./ Grant No.: IDA-67760 CONSULTANCY SERVICES FOR THE ENVIRONMENTAL, SOCIAL, HEALTH AND SAFETY (ESHS) COMPLETION AUDIT FOR THE ENERGY ACCESS AND QUALITY IMPROVEMENT PROJECT (EAQIP) The Government of Rwanda has received financing from the World Bank toward the cost of Rwanda Energy Access and Quality Improvement Project and intends to apply part of the proceeds for consulting services. The consulting services (“the Services”) include developing the environmental, social, health and safety (ESHS) completion audit for the Energy Access and Quality Improvement Project (EAQIP). This audit is expected to be conducted for a period of two (2) months starting from the date of issuance of the service order Interested consulting firms may download the Request for Expressions of Interest (REOI) document and the detailed Terms of Reference (TOR) for the assignment, free of cost, from Rwanda energy group website (www.reg.rw) The Energy Development Corporation Limited (EDCL) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. The shortlisting criteria are proof of registration in the Rwanda Association of Professional Environmental Practitioners (RAPEP) or its equivalent in the country of origin and qualification and experience of the firm as required in the Terms of references (in table indicating name, scope, period of execution, employer’s name and address) proven by certificates of good completion. The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers”
Supply and installation of automated green houses for improved Irish potato seeds multiplication.
Rwanda Environment Management Authority
TENDER NOTICE TITLE: Supply and Installation of full automated Greenhouses for Irish Potatoes Seeds Multiplication under Volcanoes Community Resilience Project (VCRP) The Rwanda Environment Management Authority (hereinafter called ‘’Client”) has a budget towards the cost of Supply and Installation of full automated Greenhouses for Irish Potatoes Seeds Multiplication under Volcanoes Community Resilience Project (VCRP) . The Client intends to apply a portion of the funds to eligible payments under the contract for which this Bidding Document is issued. Rwanda Environment Management Authority invites qualified bidders to submit bids for the of Framework contract supply chemicals and consumables of laboratory as mentioned in the statement of Requirements. Tender document in English may be obtained from the E-Procurement system for Rwanda ( www.umucyo.gov.rw ) . For submission of their bids, all interested bidders must pay non – refundable fee of Ten hundred Rwandan Francs (10,000rwf) to the accounts of Rwanda Revenue Authority opened at any commercial Bank. All interested bidders may obtain some complementary information by writing using the E–Procurement System not later than 14 days before the fixed deadline for the submission of bids. Interested bidders must submit a bid security referring to E-procurement system . All bids will be submitted online using the E-Procurement system before the date and time indicated therein. Late bids will not be accepted by the system. Bids will be opened automatically by the E–Procurement system on the same day at time indicated therein. Interested bidders shall conduct a mandatory field visit on 8th and 9th January 2026. On 8th January, bidders will visit TAMIRA RAB Station, located in Bugeshi, and on 9th January, they will visit Musanze RAB Station, located in KINIGI. Bidders who fail to attend the field visit or to submit a valid field visit certificate shall be disqualified. The bids shall remain valid for a period of 120 days sta
Germany – Business development consultancy services – 10022598-Short-Term Expert Pools to support negotiations and implementation of the African Continental Free Trade Area (AfCFTA)
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
Background: Although many of the world"s fastest-growing economies are in Africa, trade among African countries remains limited. The continent mostly exports raw materials and agricultural products, while it imports machinery, equipment, and food mainly from outside Africa. The African Continental Free Trade Area (AfCFTA), which is one of the African Union"s (AU) flagship projects for the implementation of its Agenda 2063, aims to change this. It is expected that, with the introduction of the free trade zone, intra- African trade will be 15% to 25% higher by 2040 (UNECA). The AfCFTA agreement has been signed by 54 of the 55 African Union Member States (MS) and became effective under international law in May 2019. The full implementation of the AfCFTA will lead to a continental single market of more than 1.4 billion people with an aggregate GDP exceeding USD 2 trillion. Our Approach: The GIZ implemented project "Support to the African Continental Free Trade Area (AfCFTA) II" cofinanced by the BMZ and the EU, seeks to improve framework conditions for the realisation of the AfCFTA and supports the outstanding negotiations and the implementation of the AfCFTA. For this, the programme supports the African Union, specifically the Department for Economic Development, Trade, Tourism, Industry, Minerals (ETTIM) and the AfCFTA Secretariat at the continental level in the coordination of AfCFTA implementation. On the regional level the programme cooperates with Regional Economic Communities (RECs), specifically EAC (East African Community), ECOWAS (Economic Community for West African States) and SADC (South African Development Community, plus additional RECs based on request). The programme also supports Member States (Ethiopia, Ghana, Ivory Coast, Kenya, Malawi, Rwanda, Tunisia, Zambia, plus additional Member States based on request) by working with national institutions, like trade ministries and customs, to implement the agreement. Lastly, the programme works closely with pr
EOI - Rwanda - International Irrigation Technical Advisor - MMWRDP – Additional Financing
African Development Bank Group
The main objective of this consultancy is to provide high-level technical advisory services to the Project Implementation Team (PIT) in the planning, design review, procurement, implementation supervision, and management of irrigation infrastructure under Muvumba Irrigation Sub-project.
Le Gouvernement de la République du Burundi a reçu un financement du Fonds Africain de Développement (FAD) afin de couvrir le coût du Projet de Développement Intégré Burundi-Rwanda (BRIDEP) et a l’int
AMI - Burundi - Consultant individuel (CI) chargé de réaliser l’audit de conformité environnementale et sociale du Projet BRIDEP-Composante Burundi
AMI - Burundi - Consultant individuel (CI) chargé de réaliser l’audit de conformité environnementale et sociale du Projet BRIDEP-Composante Burundi AMI - Burundi - Consultant individuel (CI) chargé de réaliser l’audit de conformité environnementale et sociale du Projet BRIDEP-Composante Burundi Updated: 03-Jul-2026
The main objective of this consultancy is to provide high-level technical advisory services to the Project Implementation Team (PIT) in the planning, design review, procurement, implementation supervi
EOI - Rwanda - International Irrigation Technical Advisor - MMWRDP – Additional Financing
EOI - Rwanda - International Irrigation Technical Advisor - MMWRDP – Additional Financing EOI - Rwanda - International Irrigation Technical Advisor - MMWRDP – Additional Financing Updated: 30-Jun-2026
Rwanda Urban Mobility Improvement Project
City of Kigali
GENERAL PROCUREMENT NOTICE Country: Rwanda Name of Project: Rwanda Urban Mobility Improvement (RUMI) Project Practice area / sector: Transport Loan No./Credit No./TF No./Grant No .: 78610-RW; 77240-RW and 78620-RW Project ID No.: P176885 The Government of Rwanda has received financing in the amount of US$ 204.04 million equivalent from the World Bank toward the cost of the Rwanda Urban Mobility Improvement (RUMI) Project, and it intends to apply part of the proceeds to payments for goods, works and consulting services to be procured under this project. This project will be jointly financed by the European Investment Bank and European Union (EIB/EU). The project will include the following components with planned open international contracts as summarized in the table below: No Component Planned Open International Contracts Budget US$ Million Category Expected publication date 1 Component 1: Urban Mobility Improvement This component will mainly include: Development of Nyabugogo Multimodal Transit Hub and Surrounding Area; Enhancement of the Public Transport System and Walking and Cycling Environment along Dedicated Bus Lanes (DBLs); Improvements for Safe Neighborhoods Access by providing safe walking and cycling lanes Construction of Nyabugogo Multi Modal Transit Terminal and terminal area (Design and Build) 149.09 Works June 2026 2 Consultancy Services for Contract Management & Supervision of works for Nyabugogo Multi Modal Transit Terminal and Terminal area 7.45 Services Aug 2026 3 Consultancy services for feasibility study and preliminary design for Non-motorized Transport (NMT) of defined low-income neighborhoods and along DBL corridors 0.30 Services Sept 2026 4 Component 2: Promoting E-mobility This component will mainly include: Feasibility Study and Detailed Design for E-Bus Depots with Charging Facilities and construction of at least One E-Bus Charging Depot; Procurement and purchase of Electric Buses: The project will finance the acquisition the first batch o
Rwanda - NELSAP Interconnection Project – IPR April 2019
Rwanda
Project: NELSAP INTERCONNECTION PROJECT - RWANDA | Sector: Power | Implementing Agency: ENERGY WATER AND SANITATION AUTHORITY EWASA | Location: Northen and central Rwanda | Financing: ADF: 30470000 Government: 1930000
EOI – Rwanda - Study for Transport and Trade Facilitation on North-South Corridor on Gisiza-Rubavu Road Project - RTDA
Rwanda
Project: RWANDA-PROJET D’AMENAGEMENT DE ROUTES (MUGINA-MABANDA ET RUBAVU-GISIZA)-BURUNDI/RWANDA | Sector: Transport | Implementing Agency: MINISTERE DES INFRASTRUCTURES KIGALI RWANDA | Financing: ADF: 45050000 Government: 6170000
Multinational - Projet d’aménagement de routes (Mugina-Mabanda-Nyanza lac et Rubavu-Gisiza) et de facilitation de transport sur le corridor nord – sud, Phase III - EER Juin 2019
Multinational
Project: RWANDA-PROJET D’AMENAGEMENT DE ROUTES (MUGINA-MABANDA ET RUBAVU-GISIZA)-BURUNDI/RWANDA | Sector: Transport | Implementing Agency: MINISTERE DES INFRASTRUCTURES KIGALI RWANDA | Financing: ADF: 45050000 Government: 6170000
Multinational - Rwanda-projet d’aménagement de routes (Mugina-Mabanda Et Rubavu-Gisiza)-Burundi/Rwanda - IPR May 2022
Multinational
Project: RWANDA-PROJET D’AMENAGEMENT DE ROUTES (MUGINA-MABANDA ET RUBAVU-GISIZA)-BURUNDI/RWANDA | Sector: Transport | Implementing Agency: MINISTERE DES INFRASTRUCTURES KIGALI RWANDA | Financing: ADF: 45050000 Government: 6170000
Multinational - Projet d'aménagement de routes (Mugina - Mabanda - Nyanzalac et Rubavu Gisiza) et de facilitation de transport sur le corridor nord -sud phase III - EER Juillet 2019
Multinational
Project: BURUNDI- PROJET D'AMMENAGEMENT ET DE BITUMAGE DE ROUTES MUGINA-MABANDA-NYANZA-LAC | Sector: Transport | Implementing Agency: MINISTERE TRAV PUBLICS ET EQUIPEMT DIRECTION GENERALE DES ROUTES | Location: PROVINCES OUEST DU RWANDA ET DU BURUNDI | Financing: ADF: 27500000 Government: 3070000
Rwanda - Scaling Up Energy Access Project - IPR July 2019
Rwanda
Project: SCALING-UP ENERGY ACCESS PROJECT | Sector: Power | Implementing Agency: ELECTRICITY, WATER AND SANITATION AUTHORITY (EWSA) | Financing: ADF: 27365000 Government: 2596000
Rwanda - Regional Rusumo Hydropower Project (Rwanda Transmission Line) - IPR July 2019
Rwanda
Project: REGIONAL RUSUMO HYDROPOWER - RWANDA | Sector: Power | Implementing Agency: ENERGY WATER AND SANITATION AUTHORITY EWASA | Financing: ADF: 18884000 Government: 1351000 NTF: 6500000
Multinational - Regional Rusumo Hydropower - Rwanda - IPR December 2021
Multinational
Project: REGIONAL RUSUMO HYDROPOWER - RWANDA | Sector: Power | Implementing Agency: ENERGY WATER AND SANITATION AUTHORITY EWASA | Financing: ADF: 18884000 Government: 1351000 NTF: 6500000
Rwanda - Regional Rusumo Hydropower - Ipr May 2022
Rwanda
Project: REGIONAL RUSUMO HYDROPOWER - RWANDA | Sector: Power | Implementing Agency: ENERGY WATER AND SANITATION AUTHORITY EWASA | Financing: ADF: 18884000 Government: 1351000 NTF: 6500000
Multinational - Rwanda Regional Rusumo Hydropower - IPR May 2023
Multinational
Project: REGIONAL RUSUMO HYDROPOWER - RWANDA | Sector: Power | Implementing Agency: ENERGY WATER AND SANITATION AUTHORITY EWASA | Financing: ADF: 18884000 Government: 1351000 NTF: 6500000
Multinational - Rwanda Regional Rusumo Hydropower - IPR January 2024
Multinational
Project: REGIONAL RUSUMO HYDROPOWER - RWANDA | Sector: Power | Implementing Agency: ENERGY WATER AND SANITATION AUTHORITY EWASA | Financing: ADF: 18884000 Government: 1351000 NTF: 6500000
Multinational - East Africa Centers of Excellence Rwanda - IPR March 2021
Multinational
Project: EAST AFRICA CENTERS OF EXCELLENCE RWANDA | Sector: Social | Implementing Agency: Ministry of Education,Science,Technology and Scientific Research | Location: Rwanda | Financing: ADF: 12500000
Multinational - Regional Centre of Excellence for Biomedical Engineering and E-Health (CEBE) - Ipr December 2021
Multinational
Project: EAST AFRICA CENTERS OF EXCELLENCE RWANDA | Sector: Social | Implementing Agency: Ministry of Education,Science,Technology and Scientific Research | Location: Rwanda | Financing: ADF: 12500000
Multinational - East Africa Centre of Excellence for Biomedical Engineering and E-Health (CEBE) - Ipr July 2022
Multinational
Project: EAST AFRICA CENTERS OF EXCELLENCE RWANDA | Sector: Social | Implementing Agency: Ministry of Education,Science,Technology and Scientific Research | Location: Rwanda | Financing: ADF: 12500000
Multinational - Rwanda East Africa Centre of Excellence for Biomedical Engineering and E-Health (CEBE) - IPR May 2023
Multinational
Project: EAST AFRICA CENTERS OF EXCELLENCE RWANDA | Sector: Social | Implementing Agency: Ministry of Education,Science,Technology and Scientific Research | Location: Rwanda | Financing: ADF: 12500000
DataMesh Tender Radar
Win more UK IT & software tenders — one curated email a week
We watch Find a Tender & Contracts Finder so you don't have to. Every Monday you get the new UK IT & software tenders worth bidding on — curated by hand, not scraped and dumped.
- Hand-curated — no keyword spam, no duplicates
- Every notice with its buyer, value, deadline & how to bid
- One email a week — cancel anytime