CPV 9070
Environmental services
53 active tenders tagged under this CPV division — sort, filter, and drill in via the master tenders page.
Etude bilan besoins-ressource en eau et vulnérabilité hydriques sur le bassin de la Dordogne
Epidor
PRO005166 - ORiW - Design and Integration Partner
United Utilities Water Limited
This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms and chemicals. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. This Scope of Requirements does not include agricultural impacts; these are being considered by other programmes. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather d
Wintering bird surveys on the Humber Estuary, January 2027 to March 2027
Natural England
This project involves undertaking wintering bird surveys in agricultural fields and other open habitats up to 10 km from the Humber Estuary SPA. The aim of this project is to collect additional data to support a Natural England-led Habitat Suitability Modelling project. The modelling is intended to help identify areas of potentially suitable habitat for wintering waterbirds and wading bird species associated with the Humber Estuary SPA, helping to improve our understanding of their distribution in the surrounding landscape. This commission requires wintering bird surveys at 40 sample locations between January and the end of February (or early March if required).
Marché d'ANIMATION NATURA 2000-.
Communauté de Communes de de Damvillers Spincourt
Marché d'animation NATURA 2000 : Animation du site Natura 2000 FR4100156 « Marais de Chaumont-Devant-Damvillers » Animation du site Natura 2000 FR4112001 « Forêts et zones humides du pays de Spincourt ».-.
ACCORD-CADRE À BONS DE COMMANDE ET A MARCHES SUBSEQUENTS RELATIF À DES MISSIONS DE MAÎTRISE D'OEUVRE ET D'ÉTUDES ASSOCIÉES EN MATIÈRE DE GEMAPI SUR LE TERRITOIRE D'HYDREAULYS
HYDREAULYS
Il s'agit d'un marché public de services conclu sous la forme d'un accord-cadre à bons de commande et à marchés subséquents avec un seul opérateur économique, conformément à l'article L2125-1 du Code de la Commande Publique. Le Cahier des Clauses Administratives Particulières (CCAP) se réfère au Cahier des Clauses Administratives Générales applicable aux Marchés Publics de fournitures courantes et de services (ci-après dénommé CCAG/FCS). Il a pour objet la réalisation de missions de maîtrise d'oeuvre, d'assistance à maîtrise d'ouvrage, d'études réglementaires et d'études techniques liées à l'exercice de la compétence GEMAPI sur le territoire d'HYDREAULYS. Les prestations susceptibles d'être commandées comprennent notamment : - études de faisabilité ; - diagnostics de berges ; - caractérisations hydromorphologiques ; - états des lieux de cours d'eau et d'ouvrages hydrauliques ; - campagnes de mesure de débit, hauteur d'eau et qualité ; - études hydrauliques ; - dossiers de Déclaration d'Intérêt Général (DIG) ; - dossiers au titre de la Loi sur l'Eau ; - demandes de subventions et de financements ; - missions de maîtrise d'oeuvre de conception ; - missions de maîtrise d'oeuvre de réalisation ; - missions d'ordonnancement, pilotage et coordination ; - assistance à la passation des marchés de travaux ; - suivi de travaux et assistance aux opérations de réception ; - études techniques complémentaires.
Réalisation du suivi des Macro-Invertébrés et des Diatomées dans les cours d'eau de la Martinique
Office De l'Eau Martinique
réalisation de mesures de paramètres physico-chimiques et de prélèvements d'éléments biologiques, identification et comptage d'éléments biologiques , calcul d'indice IDA et IBMA , rapports de terrain, Interprétation des résultats et bancarisation des données.
PRO005166 - ORiW - Design and Integration Partner
United Utilities Water Limited
This notice relates to tender activity for the provision of certain design and integration services, as explained below. United Utilities Water Limited (UU) proposes to deliver a programme titled Only Rainwater into Windermere (ORiW), with the ambition to make Windermere the cleanest lake in England by removing discharges from both public and private sources, while also addressing highway runoff. This is a long-term, transformational programme designed to protect the lake's ecology, water quality and amenity value for future generations. The target end state is "Only Rainwater into Windermere", restoring the lake as close as possible to its natural condition and reducing the risk of harmful algal blooms and chemicals. The programme will deliver resilient wastewater infrastructure that supports communities, businesses and the wider National Park, while creating a potential blueprint for freshwater restoration across England. This Scope of Requirements does not include agricultural impacts; these are being considered by other programmes. A coalition has been established to develop and deliver the ORiW feasibility phase. It brings together key stakeholders, including UU, local authorities, regulators and environmental organisations, to provide strategic direction and has sponsored the commission of a ‘feasibility study’ to ascertain the art of the possible for achieving ORiW. Through the commission there are now feasible options for achieving the ambition, to improve water quality, and enhance the environmental resilience of the Windermere catchment, through a proposed ORiW system and wider infrastructure. The proposed ORiW system is made up of multiple workstreams; • First Time Sewerage (FTS), connecting properties to the public sewer network that are currently outside of the network and have never previously been connected to it. • First time Treatment (FTT), for the sites where FTS is not possible, a remote treatment solution will be implemented. • Reduced weather d
GMCA 2235 - Spatial Development Strategy
Greater Manchester Combined Authority
Integrated Impact Assessment (IIA) - Greater Manchester Spatial Development Strategy The Greater Manchester Combined Authority (GMCA) is looking to commission an Integrated Impact Assessment (IIA) to support the preparation of a Spatial Development Strategy (SDS) for Greater Manchester. Statutory SDSs were introduced through the Planning and Infrastructure Act 2025. The SDS will provide a strategic planning framework for the city-region over a 25-year plan period and once adopted, it will form part of the development plan for Greater Manchester’s local planning authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford, and Wigan). It is a high-level, statutory planning document that will set strategic policies covering growth, housing, employment, infrastructure, the environment, and transport. Greater Manchester Combined Authority is therefore undertaking an expression of interest for the following: - Integrated Impact Assessment (IIA) on the forthcoming Greater Manchester Spatial Development Strategy, comprising of: - Sustainability Appraisal (SA) incorporating the requirements of a Strategic Environmental Assessment) - Health Impact Assessment (HIA); and - Equality Impact Assessment (EqIA). IIA for Greater Manchester Spatial Development Strategy: - IIA Scoping Report - IIA of spatial options/ reasonable plan alternatives - IIA of whole SDS Plan - IIA of any proposed modifications to the SDS, as result of statutory consultation and preparation of Final IAA report for SDS submission
Bat Advice Service (2027)
NATURAL ENGLAND
Bats and their roosts are protected under Section 9 of the Wildlife and Countryside Act 1981 (as amended) and regulation 43 of the Conservation of Habitats and Species Regulations 2017 (as amended) The Conservation of Habitats and Species Regulations 2017. The legislation places obligations on both individuals and public bodies that are aimed at ensuring that the conservation status of bats is maintained. The United Kingdom is party to a number of international treaties focused on conservation (Rio, Bern and Bonn Conventions). The Bat Advice Service (2027) will meet Natural England’s statutory obligations under the 1981 Wildlife and Countryside Act and Conservation of Habitats and Species Regulations 2017 to provide advice and guidance to householders. The Bat Advice Service will provide specialist advice, primarily to householders, through a telephone, email, and website service and, when necessary, through visits carried out by
HWTWRP - Biodiversity Net Gain - Market Engagement
Southern Water Services Limited
The need for the HWTWRP Project is to create a new, resilient and sustainable water supply that will protect and enhance the county’s rare and sensitive chalk streams, while maintaining supplies for communities and the local economy. Biodiversity Net Gain (BNG) for the Project Biodiversity Net Gain (BNG) is an approach to development that aims to leave biodiversity in a measurably better state than beforehand. At the point of the Project’s submission, BNG was not a requirement for Nationally Significant Infrastructure Projects (NSIP) and therefore was not a legal requirement for the Project, despite this, the project has committed to the delivery of a 10% net gain. Mandatory BNG for NSIP applications came into force on 2nd November 2026 and applied to NSIP’s submitted from November 2026 onwards. The National Policy Statement for Water Resources Infrastructure (NPSWRI) states that “Development should contribute to and enhance the natural environment by providing net gains for biodiversity”. As such Southern Water has committed to delivering at least 10% BNG for the Project and has prepared a Biodiversity Gain Plan setting out its approach to the delivery of BNG. Following the application of the mitigation hierarchy, including the retention, reinstatement, creation and enhancement of habitats within the Order Limits, additional off-site biodiversity units will be required to achieve the Project commitment of at least 10% BNG. Where practicable, BNG will be delivered within the Order Limits as defined in the Development Consent Order (DCO) Application. However, a significant proportion of the required biodiversity units will need to be secured off-site. As far as practicable, all biodiversity units will be delivered within Hampshire. The current off-site BNG requirement is 201.77 biodiversity units, comprising: • 169.94 area habitat units • 29.69 hedgerow units • 2.14 watercourse units The indicative off-site habitats required to deliver these units are: • Other neutra
HWTWRP - Biodiversity Net Gain - Market Engagement
Southern Water Services Limited
The need for the HWTWRP Project is to create a new, resilient and sustainable water supply that will protect and enhance the county’s rare and sensitive chalk streams, while maintaining supplies for communities and the local economy. Biodiversity Net Gain (BNG) for the Project Biodiversity Net Gain (BNG) is an approach to development that aims to leave biodiversity in a measurably better state than beforehand. At the point of the Project’s submission, BNG was not a requirement for Nationally Significant Infrastructure Projects (NSIP) and therefore was not a legal requirement for the Project, despite this, the project has committed to the delivery of a 10% net gain. Mandatory BNG for NSIP applications came into force on 2nd November 2026 and applied to NSIP’s submitted from November 2026 onwards. The National Policy Statement for Water Resources Infrastructure (NPSWRI) states that “Development should contribute to and enhance the natural environment by providing net gains for biodiversity”. As such Southern Water has committed to delivering at least 10% BNG for the Project and has prepared a Biodiversity Gain Plan setting out its approach to the delivery of BNG. Following the application of the mitigation hierarchy, including the retention, reinstatement, creation and enhancement of habitats within the Order Limits, additional off-site biodiversity units will be required to achieve the Project commitment of at least 10% BNG. Where practicable, BNG will be delivered within the Order Limits as defined in the Development Consent Order (DCO) Application. However, a significant proportion of the required biodiversity units will need to be secured off-site. As far as practicable, all biodiversity units will be delivered within Hampshire. The current off-site BNG requirement is 201.77 biodiversity units, comprising: • 169.94 area habitat units • 29.69 hedgerow units • 2.14 watercourse units The indicative off-site habitats required to deliver these units are: • Other neutra
Satellite-Enabled Heat and Humidity Risk Management for NHS Estates
Department for Science, Innovation & Technology
The UK Space Agency's Unlocking Space for Government programme has funding available for research and development to address overheating in NHS estates. The funding will support the creation of innovative, satellite-enabled products and services that help NHS Estates teams identify, prioritise, and mitigate heat and humidity risks across their trusts. A Contract for Innovation is one of the routes being considered for delivering this funding. We invite suppliers, researchers, and other interested organisations to join this market engagement webinar to learn more about this opportunity and to help shape it. . Our understanding of the operational challenges and available capabilities is shaped by close collaboration with NHS stakeholders, the Satellite Applications Catapult, and relevant suppliers. We are aware of established commercial capabilities in environmental heat mapping, climate risk analytics, and building performance modelling and monitoring. Our findings indicate that satellite-enabled technology and data, along with data from the NHS and relevant suppliers, can innovate existing methods of heat analysis and thermal modelling; this is where targeted research and development funding can add the most value. This webinar forms part of our pre-funding call market engagement under the Procurement Act 2023. It gives the wider market an open opportunity to engage with and test this understanding before the scope and route to market are finalised. In this webinar, the UK Space Agency, the NHS and the Satellite Applications Catapult will present: · An introduction to the Unlocking Space for Government programme · Our current understanding of the market and existing capabilities · The challenges regarding overheating for NHS teams and patients · An overview of the proposed funding route, including indicative timescales, scope, and expectations · How to share information on existing capabilities, products and services, including any available through government frame
Funkcionalna specifikacija za novi e-ONTO Očevidnik o nastanku i tijeku otpada
MINISTARSTVO ZAŠTITE OKOLIŠA I ZELENE TRANZICIJE, Grad Zagreb
Wintering bird surveys on the Humber Estuary, January 2027 to March 2027
Natural England
This project involves undertaking wintering bird surveys in agricultural fields and other open habitats up to 10 km from the Humber Estuary SPA. The aim of this project is to collect additional data to support a Natural England-led Habitat Suitability Modelling project. The modelling is intended to help identify areas of potentially suitable habitat for wintering waterbirds and wading bird species associated with the Humber Estuary SPA, helping to improve our understanding of their distribution in the surrounding landscape. This commission requires wintering bird surveys at 40 sample locations between January and the end of February (or early March if required).
Wintering bird surveys on the Humber Estuary, January 2027 to March 2027
Natural England
This project involves undertaking wintering bird surveys in agricultural fields and other open habitats up to 10 km from the Humber Estuary SPA. The aim of this project is to collect additional data to support a Natural England-led Habitat Suitability Modelling project. The modelling is intended to help identify areas of potentially suitable habitat for wintering waterbirds and wading bird species associated with the Humber Estuary SPA, helping to improve our understanding of their distribution in the surrounding landscape. This commission requires wintering bird surveys at 40 sample locations between January and the end of February (or early March if required).
Leeds City Centre Enhanced Environmental Enforcement
Leeds City Council
This tender is related to the commissioning of a two-part environmental enforcement and education service for Leeds city centre (and potentially other high footfall areas within the Leeds District). The first part will comprise high volume Littering Enforcement, to support the Council’s objectives in maintaining the cleanliness and attractiveness of Leeds city centre as a destination. The second part is a broader enforcement and education role, described here under the heading of a ‘City Centre Support Officer’ role.
Integration Technical Operations Assurance & Environment (ITOAE)
East West Rail Company Limited
The East West Railway Company (the Authority) is responsible for the delivery of East West Rail (EWR), a Nationally Significant Infrastructure Project providing new and upgraded rail links between Oxford, Milton Keynes, Bedford and Cambridge. EWR Co. is responsible for leading the development, procurement and commissioning of the railway. The Authority is undertaking a procurement for an Integration, Technical, Operations, Assurance and Environmental (ITOAE) Partner to support the development and delivery of the EWR programme. Overview of the Intended Contract. The Authority is appointing a single ITOAE Partner under an NEC4 Professional Service Contract, operated as a term appointment, for a period of up to twelve (12) years, with value-for-money breakpoints at Years 3, 6 and 9. The ITOAE Partner is a single contract: it is not a framework and it is not divided into lots. Services comprise a continuous Core Services baseline across all five pillars (Integration; Technical; Operations; Assurance; and Environmental & Consents), with time-bound Authorised Services instructed as required. Relationship with the CSF and main works. The Authority is separately procuring a Client Support Framework (CSF). The Authority's position is that the ITOAE Partner will be structurally separated from the CSF and from the main works: the appointed ITOAE Partner will not be eligible to be awarded a main works contract or a place on the CSF for the duration of the ITOAE contract. The purpose of this separation is to protect the independence of integration and assurance, to mitigate real or perceived conflicts of interest, and to align with independent review findings on major programme governance (including the Stewart Review, 2025). Conditions of Participation. The conditions of participation are summarised in the Participation section of this notice and will be assessed, with full detail and scoring, in the Pre-Selection Questionnaire (PSQ) issued at the selection stage, in accordance
Verifikacija Izvješća o emisijama CO2 i Izvješća o dodjeli besplatnih emisijskih jedinica CO2
HEP-Proizvodnja d.o.o., Grad Zagreb
Accord-cadre de service de médiation environnementale dans les espaces de nature de Grenoble-Alpes Métropole (Réserves Naturelles Régionales, Espaces Naturels Métropolitains et Col de Porte)
GRENOBLE ALPES METROPOLE
Le marché est passé en procédure formalisée car un autre marché répondant à un besoin similaire sera passé l'année prochaine. Le montant maximum est de 200 000 euros HT sur toute la durée du marché. La durée est d'un an reconductible 3 fois un an (soit 4 ans au total). Le marché débutera à la notification
CT4692 Programme Support Works Framework
East West Rail Company Limited
East West Railway Company intends to procure a multi-lot Programme Support Works Framework to deliver a range of enabling, survey and early-stage works in support of the East West Rail programme. The framework will provide a coordinated mechanism for the delivery of works required to prepare the route ahead of main construction. These activities are expected to include (but are not limited to): *Ground investigation and site surveys *Environmental mitigation and ecological works *Utilities surveys and diversions *Archaeological investigations and mitigation *Early site establishment works (e.g. compounds, access routes, haul roads) The purpose of the framework is to accelerate programme readiness, reduce delivery risk, and enable efficient mobilisation of future main works. The estimated value is up to £450m ex VAT (subject to change) which is spread across all lots over a period of 8 years. This value is purely indicative and not committee to be spent over the duration of the framework. The duration will be structured as a 4 year core term with the following optional extentions- 2 years, 1 year and a further 1 year (4+2+1+1). The framework lots are aligned to market specialisms to encourage participation by SMEs and Tier 2/3 suppliers with multiple suppliers awarded to each lot other than Lot 0 which will be awarded to one single supplier: Lot 0- Principle Contractor/Integrator Lot 1- Historic Environment Lot 2- Ground Investigation & Monitoring Lot 3- Environmental & Ecological Surveys Lot 4- Environmental & Ecological Works Lot 5- Enabling Works This procurement will be run concurrently with others. Bidders may tender for any or all of the Lots/Contracts identified in the table shown in document 'PSWF - Appendix Q - Lot_Contract Restrictions'. This approach is intended to support market participation and allow bidders to put forward appropriate delivery solutions. However, submitting tenders for multiple Lots/Contracts across the Procurements does not mean a bidd
Legionella Control and Cleaning Services for all hot and cold-water systems within Council Facilities
Mid and east Antrim Borough Council
Tenders are invited from a suitably qualified and experienced contractor for the supply of Legionella control services, for inspections and disinfections of shower/spray outlets, cold water storage tanks, thermostatic mixing valves, calorifiers, Legionella Risk Assessments, Legionella Training and Legionella Water Sampling within the premises of Mid and East Antrim Borough Council buildings.
Tree and Woodland Assessments for Cambridgeshire
Cambridgeshire County Council
Cambridgeshire County Council is seeking a supplier to deliver a comprehensive programme of tree and woodland assessments across Cambridgeshire. The commission comprises two complementary work packages: (1) woodland condition assessments of CCC-owned woodland assets, including biodiversity, public access, timber potential and management recommendations; and (2) a countywide tree, woodland and hedgerow canopy assessment, including carbon stock and sequestration assessment, SEEA-aligned Natural Capital Accounts and strategic opportunity mapping. The outputs will support woodland management, climate action, nature recovery, natural capital assessment and future environmental investment across Cambridgeshire.
Услуга набавке и садње хортикултуре у к. "Аеродром" Панчево
Министарство одбране Републике Србије, Београд, ПИБ: 102116082
Surveillance des macroalgues subtidales et intertidales et faune associée des substrats rocheux pour la surveillance des eaux côtières et de transition
AGENCE DE L’EAU ARTOIS - PICARDIE
Prestations de relevés terrain et d’analyses des paramètres de la surveillance des macroalgues subtidales et intertidales et de la faune associée des substrats rocheux dans le cadre de la Directive Cadre sur l’Eau et de la Directive Cadre Stratégie pour le Milieu Marin pour la surveillance des eaux côtières et de transition des bassins Artois-Picardie, Seine-Normandie, Loire-Bretagne et Adour-Gar