Louise Bridge Substructure Rehabilitation and Riverbank Stabilization Works
The City of Winnipeg
D2. SCOPE OF WORK D2.1 The Work to be done under the Contract shall consist of structural pier rehabilitation works riverbank stabilization works, underwater riprap placement and supply and installation of bridge bearings. D2.2 Parts of Work include: (a) Part 1 – must achieve the Critical Stages in accordance with D22 and be substantially complete in accordance with D23 and shall include all the Works of the Contract described in D2.3(a) below. (b) Part 2 – execution of the Part 2 Work is subject to the City obtaining legal access to the private property located east of the bridge on the north riverbank to undertake Part 2 Work as describe in D2.3(b) below. If the City provides notice in accordance with D21.3 that the property is available for entry, it may be undertaken in the same timeframe as Part 1 or it may be deferred to fall/winter of 2027/2028 and be substantially completed in accordance with D23.1(b). The contractually binding schedule is subject to the Contractor’s binding declaration as per D21. D2.3 The major components of the Work for both Part 1 and Part 2 are as follows (a) Part 1: (i) Mobilization (ii) Traffic Control (iii) Installation and removal of temporary access roads to river level (iv) Installation and removal of temporary access berms in the Red River (v) Supply and installation of sheet piling around perimeter of river piers. (vi) Partial removal of existing concrete collars on limestone block river piers. (vii) Design, supply, and installation of micro-piles around perimeter of river piers. (viii) Installation of reinforcement ties including coring transversely through concrete- rubble-filled limestone block pier shafts, casing the core holes and grouting the bars. (ix) Supply and installation of reinforcing steel dowels into the limestone block piers. (x) Supply and placement of concrete reinforcing steel. (xi) Supply and installation of reinforced concrete base slabs and pier jackets at river piers. (xii) Supply and installation of rockf
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
MINOR STRUCTURE REHABILITATION TO THE EXISTING BRIDGE OVER SOURIS RIVER PTH 22
Manitoba Transportation and Infrastructure - Tendering and Contracts
Consulting Services for Cornish Lift Station Upgrades & St Charles Lift Station
The City of Winnipeg
Ireland – Engineering works and construction works – MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Transport Infrastructure Ireland (TII)
North End Water Pollution Control Centre (NEWPCC) Dewatering Centrifuge Overhaul
The City of Winnipeg
STRUCTURE REHABILITATION (BITUMINOUS RECONSTRUCTION) PTH 101 (NORTH PERIMETER)
Manitoba Transportation and Infrastructure - Tendering and Contracts
Free tender alerts
Get a weekly digest of Canada tenders
New Canada tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.