Central Plant Upgrades - Phase 1
St Clair College of Applied Arts and Technology
The Purchaser is seeking Proposals from qualified and experienced Proponents to complete work for the replacement and installation of specified equipment along with all associated piping and accessories, servicing the Purchaser’s central plant operations at St. Clair College of Applied Arts and Technology – Windsor Campus, located at 2000 Talbot Road West, Windsor, Ontario N9A 6S4. The equipment includes four (4) boiler pumps, three (3) heat exchangers (pre-purchased), one (1) bypass valve, and one (1) domestic water booster pump, and associated and specified connections. The scope of work also includes all required modifications to the Building Automation System (BAS) controls sequences and programming necessary to support the new equipment and associated system changes. Major scope of work includes: The removal and replacement of four (4) boiler pumps, associated VFDs, piping, valves, accessories, instrumentation, and controls in a phased manner while maintaining a minimum of 600 BHP boiler plant capacity at all times. The removal and replacement of one (1) bypass control valve, including associated piping, controls, instrumentation, supports, and appurtenances. The removal and replacement of one (1) domestic cold water booster pump system, including VFDs, controls, flow meter, piping, accessories, supports, and appurtenances. The removal of three (3) existing shell-and-tube heat exchangers and installation of three (3) Owner-supplied plate-and-frame heat exchangers. Installation also includes associated piping, air separators, chemical dosing pots, filters, control valves, instrumentation, controls, supports, and appurtenances. Existing distribution pumps at the Energy Transfer Stations shall remain. Providing all temporary piping, bypass connections, shutdown coordination, and phasing necessary to maintain continuous operation of the central plant during construction. Providing all associated electrical power, control wiring, BAS integration, programming, graphi
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
PKC13854 Central Heating Upgrades for Domestic Tenanted Properties
Perth & Kinross Council
Commercial Heating, Ventilation, Air Conditioning (HVAC)
Carmarthenshire County Council
Sweden – Mechanical engineering installation works – Convection parts (boiler tubes) for Unit 1 in the Uppsala Waste incineration plant
Vattenfall AB Procurement Heat Sweden
SUPPLY AND INSTALL OF COOLING WATER PIPING AT SLAVE FALLS BANK 1 GSU
Manitoba Hydro
VICU2026-O-002 Burwash Hall Kitchen HVAC Upgrades
Victoria University
Free tender alerts
Get a weekly digest of Canada tenders
New Canada tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.