GMCA 2171 Strategic Environmental Assessment
Greater Manchester Combined Authority
Strategic Environmental Assessment (SEA) - Greater Manchester Joint Minerals and Waste Plan The Greater Manchester Combined Authority is undertaking an expression of interest for the following: Strategic Environmental Assessment (SEA) to support the forthcoming Greater Manchester Joint Minerals and Waste Plan (GMJMWP). The 10 Greater Manchester authorities (Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Stockport, Tameside, Trafford and Wigan) are working together to produce the Greater Manchester Joint Minerals and Waste Plan. This will be a single plan to replace the existing Minerals Plan and Waste Plan, which were adopted in 2013 and 2012 respectively. The plan will be developed working in partnership with local authorities and a specialist third-party and will be produced in line with the Town and Country Planning (Local Planning)(England) Regulations 2026 under the new plan-making system. The SEA will be required as part of this work, to identify any environmental effects as a result of implementing the plan, and any reasonable alternatives. The timetable for the GMJMWP is to be agreed but, under transitional arrangements set out in the 2026 Regulations, the 10 authorities are required to give notice of commencement of plan making before 31st December 2026 and to pass through Gateway 1 by 30th April 2027. The proposed commission comprises the following activities: - Strategic Environmental Assessment for Greater Manchester Joint Minerals and Waste Plan - Preparation and consultation on the scope and level of detail of the SEA Environmental Report. This will run at the same time as the consultation on the proposed minerals and waste plan content and evidence. - Preparation and consultation on the proposed SEA Environmental Report. This will run at the same time as the as consultation on the proposed minerals and waste plan. - Review and finalise SEA Environmental Report prior to ‘Gateway 3’.
Classification
AI proposal generator
Generate a structured solution proposal in 90 seconds
Kimi drafts an 8-section bid response — exec summary, technical approach, compliance matrix, indicative pricing, timeline, why-we-win — tailored to your company profile and this exact tender.
Related opportunities
Similar tenders
Wintering bird surveys on the Humber Estuary, January 2027 to March 2027
Natural England
South East Essex Academy Trust (SEEAT) - Cleaning Tender
South East Essex Academy Trust (SEEAT)
Farm-scale landscape asset decision support framework
Natural England
PRO005166 - ORiW - Design and Integration Partner
United Utilities Water Limited
JHG - Window Cleaning Contract (Lot 1- North, Lot 2 - Tameside, Lot 3 - Midlands)
Jigsaw Homes Group
Free tender alerts
Get a weekly digest of United Kingdom tenders
New United Kingdom tenders matching your interests, delivered to your inbox once a week — no app required. Add keywords and we'll filter the digest to match.